Mining services

Business Expansion in Mining Activities

We have become one of the leading Mining contractors with experience in Overburden Removal and Coal Extraction by deploying our brand new equipments for OB/Coal excavation, loading and transportation works at 6 sites as listed below.

 

South Eastern Coalfields Limited – Jagannathpur
  • At present CREW is executing the work of Hiring of HEMM for excavating all kinds of strata /overburden/in situ, loading in to tippers, transportation and unloading of excavated materials & silt, dumping, dozing, scrapping /removal of all bands, preparation/ maintenance of haul road, water sprinkling and spreading of material at the site shown and as per directives of the Management /Engineer–in-charge at Jagannathpur OCP for a period of 4 & 1/2 Years.

 

Central Coal Fields Limited- Magadh Amrapali area
  • CREW executes the work of “Loading, Transportation and Crushing from Surface stock of Magadh OCP to Phulbasiya Railway Siding of Magadh Amrapali area” for a period of 730 days.

 

Central Coal Fields Limited- Kathara Area
  • CREW is doing the work of “Hiring of HEMM for removal of Overburden (Including rehandling of OB) and for extraction of coal at Govindpur Ph-II OCP of Kathara Area for a period of three years”

 

Central Coal Fields Limited -B&K Area
  • CREW is executing the work of “Hiring of HEMM for removal of OB including blast hole drilling, blasting, excavation, loading and transportation of all kinds of soil rocks, broken rocks, hard rocks, extraneous material including mixed soil, clay soil, pebbles, stone etc. and dumping outside the working zone, including spraying at haul road, face & the dump yard. The job involves making access trench/haul road with dozing, grading, maintenance and water sprinkling as may be required, face pumping for excavation, operation as per instruction of the Engr. I/C of AKK OCP mine of B&K Area for a period of two years”

 

Mahanadhi Coal Fields – Kulda
  • Presently CREW is executing the work of Extraction of Coal/Coal measure strata by deploying three Surface Miner imported from Germany at Kulda OCP, Basundhara Area for a total quantity of 192,42,244 Cu. M.

 

Central Coal Fields Limited - Jharkand
  • CREW is executing the work of Hiring of HEMM for Removal of OB including blast hole drilling, blasting, excavation, loading & transportation of all kinds of soil, rocks, broken rock, hard rocks and extraneous material including mixed soil, mixed hard soil, clay soil, pebble, stone etc and dumping outside the working zone, including water spraying at haul road face at dump yard. The job involves making access trench/haul road with Dozing, grading, maintenance and water sprinkling as may be required, face dumping or excavation operation as per instruction of Engineer Incharge of Jarangth OCP Mine of Kathara Area under Central Coalfields for a Period of 3 Years

 

Mahanadhi Coal Fields - Bharatpur
  • CREW has successfully completed the work of Extraction of Coal/Coal measure strata by deploying Surface Miner at Bharatpur OCP, Bharatpur area under Mahanadhi Coal Fields awarded for a period of more than Three years

 

South Eastern Coalfields Limited – Raigarh
  • CREW has successfully executed the work of “Hiring of Surface Miner & allied equipments of suitable capacity at Chhal Open Cast Mine for mechanical excavation/ cutting of coal / coal measure strata and deployment of dozer on hiring basis for removal of ridges left out, while working coal seam in slices involving extraction/ breaking of coal/cross measure/strata in slices/ layers to lumps size (-) 100 mm without resorting to drilling & blasting for a quantity of 21,72,000 Cum with minimum 5951Cum(9938 Tes) per day for a period of 1 year (365 days), Raigarh area.”